Control Hub Status and Badge Reference

The Control Hub uses status values and badges to tell you the state of a project deployment, of a component deployment, and of a project version. This page is the reference for these values.

Deployment and Component Status

A deployment reports one of the following statuses:

Status

Description

started

All component deployments are running.

starting

The deployment is starting up.

stopped

The deployment is not running.

multiple

The component deployments are in different states, for example some started and some stopped.

The multiple status applies to a project deployment as a whole. It indicates that the component deployments currently have different statuses.

updating

The deployment is being updated to another version. The platform has not finished replacing what the deployment runs.

degraded

The deployment update has stalled and will not be completed until you take action. The version to be replaced is still running.

unknown

The Control Hub cannot determine the state of the deployment. A project deployment without component deployments reports this status as well.

failed

The deployment has failed and is in an error state.

While a project or component deployment is starting, its indicator is animated.

You can filter the Deployments view by these status values. Refer to Working With the Control Hub for detailed information about filtering in the Control Hub.

Status Display

The status is displayed in the following places:

Location

Indicator

Status column of the Deployments view

Status column of the Agents view

A colored label with the status:

grafik-20261015-114424.png

Deployment details page (header)

A colored label with the status of the whole deployment:

grafik-20261015-114851.png

Component list of the deployment panel

A colored dot per component deployment:

grafik-20261015-114606.png

Deployments tab of the project details view

The status of each existing deployment of the project:

grafik-20261015-115027.png

How a Project Status Is Derived

A project deployment has no status of its own. It derives its status from the statuses of its component deployments. When all component deployments report the same status, the project deployment reports that status. A single component deployment always reports one concrete status.

Status

Description

started

A project deployment whose components are all running reports started.

multiple

When the component deployments report different statuses, the project deployment reports multiple.

stopped

A project deployment without components or with all component deployments stopped reports stopped.

failed

When the state of a component deployment cannot be determined, the component reports failed.

Refer to Working With the Deployments View for details.

Status and Available Actions

Which lifecycle actions you can use depends on the current status. The mapping is the same for a project and for a component, and in every place the actions are offered.

Project/Component Status

Available Actions

started

Restart, Stop

starting

Stop

stopped

Start

multiple

Start, Restart, Stop

The multiple status applies to a project deployment as a whole. It indicates that the component deployments currently have different statuses.

failed

Start, Restart, Stop

An action that does not apply to the current status is disabled. Delete is available in every status. Refer to Deleting a Deployment for further details.

Refer to Operating a Deployment for details on the lifecycle actions and to Deleting a Deployment for details on the delete action.

📗