Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Published by Scroll Versions from space WDESIGNER and version 22.2a

In UML, the tasks to perform by an activity are implemented to action nodes. In the Designer, you can add actions to the activity diagram by dragging out operations from the service panel and dropping them on the canvas.

Tip

Multiexcerpt include
SpaceWithExcerptINTERNAL
MultiExcerptNamehint_activity_diagram
PageWithExcerptINTERNAL:_designer_excerpts

Tip

You can do this with any operation: Operations from your data model or the Base Types, as well as operations from imported libraries or connectors.

Dropping an operation on the activity diagram creates a call operation action and the related pins.

Once added to the diagram, you can move action nodes any time.

Click the action node and drag it to a new position.

Anchor
resize_action_node
resize_action_node
You can resize action nodes by clicking the square in the bottom right corner of the element and dragging it.


You can hover over the action node to see a tooltip showing the full operation name and path.

Hovering over an operation pin shows the direction, the name and the full path of the type.